MCAS Power Systems

A power system is required for an Ke-M10 Modular Combat Armor System to function. Power systems are installed behind the pilot, between the interior and the back hardpoint.

Power System Description Pros Cons
Ke-M10-G3100 Aether Generator and Capacitor System High power Vulnerable to Aether Dampeners
Ke-M10-G3101 Plasma Generator High power Limited Fuel Supply1)
Ke-M10-G3102 Fusion Generator Long Duration Moderate Power
1)
4 Hours