This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
wip:corp:galactic_horizon [2018/01/20 09:25] – history additions made club24 | corp:galactic_horizon [2018/03/09 23:05] – ↷ Links adapted because of a move operation club24 | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Galactic Horizon ====== | ====== Galactic Horizon ====== | ||
- | + | Established in [[calendar: | |
- | 🚧 This article is a work-in-progress. Is it not currently approved. | + | |
- | + | ||
- | Established in [[calendar: | + | |
===== About Galactic Horizon ===== | ===== About Galactic Horizon ===== | ||
- | Galactic Horizon created in [[calendar: | + | Galactic Horizon created in [[calendar: |
- | In the closing weeks of [[calendar: | + | In the closing weeks of [[calendar: |
- | Together Riccard and his group designed and built the company while further developing Project Dawn to assist them in running a business with the limited staff they had. On the day of the new year Galactic Horizon became an officially recognised entity after the group was approved purchase of an unused office building in [[faction: | + | Together Riccard and his group designed and built the company while further developing Project Dawn to assist them in running a business with the limited staff they had. On the day of the new year, Galactic Horizon became an officially recognised entity after the group was approved purchase of an unused office building in [[faction: |
===Logo=== | ===Logo=== | ||
Line 32: | Line 29: | ||
A small 4 floor office building with pentagonal shape, ground floor consists of reception and relation services, second floor consists of initial design team and system code team, third floor consists of secondary design team and post design team, fourth floor consists of the management offices and conference room. | A small 4 floor office building with pentagonal shape, ground floor consists of reception and relation services, second floor consists of initial design team and system code team, third floor consists of secondary design team and post design team, fourth floor consists of the management offices and conference room. | ||
- | It’s | + | It’s run by CEO [[character: |
+ | |||
+ | It's Located within [[faction: | ||
===== Facilities ===== | ===== Facilities ===== | ||
- | Galactic Horizon does not own any production facilities or storage warehouses at this point as their size and business does not require them to operate effectively instead relying on their HQ for all main operations. | + | Galactic Horizon does not own any production facilities or storage warehouses at this point, |
===== Structure ===== | ===== Structure ===== | ||
Line 42: | Line 41: | ||
**Initial Design Team:** Consisting mainly of graphic designers the Initial Design team draws up plans for devices, vehicles, suits and other physical technology in concept and detailed sketches showing rough sizing and dimensions. | **Initial Design Team:** Consisting mainly of graphic designers the Initial Design team draws up plans for devices, vehicles, suits and other physical technology in concept and detailed sketches showing rough sizing and dimensions. | ||
- | **Secondary Design Team:** Consisting mainly of engineers and theoretical science researchers the Secondary Design team is responsible for checking and validating the probability of Initial Designs. | + | **Secondary Design Team:** Consisting mainly of engineers and theoretical science researchers, the Secondary Design team is responsible for checking and validating the probability of Initial Designs. |
**Post Design Team:** Consisting mainly of fabrication and production specialists the Post Design team performs the final check of physical products and creates lists to accompany the design sheets for clients that includes material requirements, | **Post Design Team:** Consisting mainly of fabrication and production specialists the Post Design team performs the final check of physical products and creates lists to accompany the design sheets for clients that includes material requirements, | ||
Line 51: | Line 50: | ||
==== Current Products and Projects ==== | ==== Current Products and Projects ==== | ||
+ | Pending approval: [[corp: | ||
==== Past Products and Projects ==== | ==== Past Products and Projects ==== | ||
- | [[wip: | + | [[corp: |
===== OOC Notes ===== | ===== OOC Notes ===== | ||
[[user: | [[user: | ||
- | 🚧 This article | + | this article |
---- struct data ---- | ---- struct data ---- | ||
---- | ---- | ||